|
COMMERCIAL/OTHER


Coliseum
(Pictured above) Coliseum Group 415 St John Church Rd # 205 Camp Hill, PA 17011 | General Contractor: Year Completed: | eci Construction 2007 | A design/build project with a full-sized restaurant,
two bars, a bowling alley, one hundred+ plasma TV’s and various gaming rooms throughout. The work for Coliseum
included the installation of all showroom fixtures, a fire alarm system, an extensive dimming package, elevator and all of
the special effects and site lighting in and around the building. | Carlisle Country Club 1242 Harrisburg Pike Carlisle,
PA 17013 | General Contractor: Year Completed: | R.S.
Mowery & Sons, Inc. 2004 | This project was competed in two separate phases. Phase 1 consisted of upgrading and/or replacing power and lighting
for the pool house, pool equipment, snack shop, and the installation of new site lighting. Phase 2 included the upper level
dining room, bar area, lobby, and lower level pro shop, locker room and office areas. In this phase we added several sub-panels,
parabolic fixtures, and decorative architectural lighting. | West Shore YMCA Renovation/Addition 410 Fallowfield Rd Camp Hill, PA 17011 | General Contractor: Year Completed: | Lobar Associates, Inc. 2007 | Additions to the facility included a Senior Center, a new Pre-school Room, a Child Watch room, an Indoor, Inter-Active
Water park, an increase of over 5,000 square feet to the Wellness Center, and a 14 foot water slide emptying into the Deep
Well. Along with our standard installation of lighting fixtures, power distribution and fire alarm, we also installed
cabling for the phone/data and CATV systems, and provided connections for the specialized equipment in the new water park. | Hershey
Area Playhouse 830 Cherry Drive Hershey, PA 17033 | General Contractor: Year Completed: | Brechbill & Helman 2007 | Started
in 1998, this community theater group plied their trade where ever they could—in school gymnasiums, soccer fields and
churches. Plans to convert a 136 year old barn into their permanent home began in 2002 and became a reality in 2007.
BBEC was pleased to be part of this unusual project. We installed specialty lighting throughout the structure and provided
a lighting control system as well as new power distribution wiring and fire alarm system. Check out their website www.hersheyareaplayhouse.com and click on “Our New Theater” to see our work showcased. | | | |
Other Commercial projects we
have recently completed: ~
Graystone Bank, Market Street Harrisburg ~ Graystone Bank, Linglestown Road Harrisburg ~ Shoppes at Montage, a 300,000 SF mall in Moosic, PA ~ Pennsylvania National Fire Museum—renovation ~ Home Depot, Hanover ~
Walmart, Waynesboro ~ AmeriChoice Federal Credit Union ~
Giant Foods, Dillsburg ~ PA Air National Guard, Middletown
|
|
|