Mechanicsburg
High School
The project consisted of a total renovation to the 275,000 sq. ft. high school. Done in multiple phases, our installation
included a new main switchboard and replacement of all panel boards, lighting fixtures, fire alarm system, and emergency generator.
In addition, there was extensive site lighting for the parking lots, all the driveways, and the new tennis courts. Completed
in 16 months, this work was performed while the school was occupied with students and staff.
Waidner Library
Located on the campus of Dickinson college, this addition to the Spahr library was named for Robert A. Waidner, class
of 1932. A low voltage lighting control and dimming system was installed to control over 1300 fixtures illuminating this new
wing. Installation of 15kv high voltage cabling was utilized to tie into the 12,470 volts provided on campus. Additionally,
we installed a sound system, fire alarm system, and an emergency generator. Walker underfloor duct system was installed to
provide power to the computer labs and classrooms.
| | Job: | Description | Type of Project: | General Contractor(s) | Owner: | Location: | | 97-0004 | Waidner Library | Plan & Spec | Alexander Construction | Dickinson College | Carlisle | | 1201 | Mech High School | Plan
& Spec | N/A | Mechanicsburg Area
School District | Mechanicsburg | | 97-0007 | Harrisburg Academy | Plan & Spec | Ritter Brothers, Inc. | Harrisburg Academy | Wormleysburg | | 97-0012 | Good Hope Middle School | Plan & Spec | N/A | Cumberland Valley School District | Mechanicsburg | | 98-0022 | Dickinson-Trickett Hall | Design
Build | Lobar
Associates, Inc. | PSU Dickinson School of Law | Carlisle | | 97-0018 | Palmyra Middle School | Plan & Spec | N/A | Palmyra Area School District | Palmyra | | 1,700 | Ronald H. Brown Charter School | Design Build | Ritter Brothers, Inc. | Mosaica Education, Inc. | Harrisburg | | 1504 | MHS Senior High | Plan & Spec | Reynolds Construction | Milton Hershey School | Hershey | | 304 | Shippensburg Univ Foundation-New
Office/Conference Facility | Plan
& Spec | eci
Construction | Shippensburg University Foundation | Shippensburg | | 905 | HACC - York Center | Plan & Spec | East Coast Contracting, Inc. | HACC | York | | 2106 | PSU/Dickinson School of Law-Temporary Relocation to Former Advantica
Building | Design Build | R.S. Mowery &
Sons, Inc. | Middlesex
Associates | Carlisle |
|
|
|